top of page

Installation Overview

The first step to a great job is a great beginning, click here for the pre-installation checklist    Pre-Install Checklist link

The next step to a great job is always the same no matter what the type of project click on the following link Basic Overall Project Walk Through

The MOST important part of the installation process is the refrigerant (freon) piping process. The House Call Company procedure when you have to connect or repair refrigerant piping or connections is:

Electrical Panel Replacement  

Disconnect 

MASTER Install Instructions 

  Pre-Install Checklist link      Basic Overall Project Walk Through

Install Guides

Gas Packaged

Heat Pump Packaged

Furnace & AC Split

Heat Pump Split

Mini-Split/Ductless

Support Guides

bottom of page